The upstairs ceiling is fixed and ready to be painted. The downstairs bathroom tub was slightly different size than the one that came out. Some of the existing plumbing now interfered with the drywall. Besides the drywall had to be changed to blue board. No biggie, just box in the lower part of the wall and make a small shelf out of it right? Worked great.

 

Before drywall

 

After drywall and paint

 

Ceiling up.

 

 

 

 

 

 

Everything else that was upstairs that didn't get damaged was the bedroom stuff. The furniture and stuff from all three bedrooms was stacked piled and shoved into one 12x14 room. Believe it or not there is a full size California King Tempurpedic with full canopy... mirrors and all in there. But it's all disassembled. : ) Also all the dressers, clothes and both kids beds. It was the one room in the house that had nothing done to it.

Page 1

Page 2

Page 3

Page 4

Page 5

Page 6

Page 7

Page 8

Page 9

Page 10

Page 11

Page 12

Page 13

Page 14

Page 15

Page 16

Page 17

Page 18

Page 19

Page 20

Page 21